Vulcan Stainless Steel Manufacturing Facility

Client Jandakot City HoldingsVulcan Warehouse

Year 2018 – 2019

Value $3.4m

Our Role
Project Manager and Superintendent

Project
Jandakot City Holdings (JCH) engaged Insight Project Services (Insight) to oversee and project manage the design and construction of the new Vulcan Stainless Steel Manufacturing Facility in Jandakot.

The site is 7,857m2 and the new facility has been designed specifically to suit the bespoke operational requirements of the Tenant.

The facility consists of a 4,000m2 manufacturing facility and warehouse building inclusive of amenities and lunch room space.  The building is an expansion of the current facilities occupied by the Tenant, although separated from the current building by an existing external hardstand area.  The external hardstand comprises 3,857m2 of heavy-duty concrete pavement.  The site is fully sprinkler protected.

Vulcan’s requirements have been incorporated into the design from inception.  Tenant specific power, water and exhaust provisions have been included to cater for the Tenants high speed steel cutting saws and milling machines.  4 x overhead gantry cranes are included in the works.